The entire stretch of road passing through Phase VI, all the way up to Phase XI, is set to be widened with initial digging-up work starting on the road in Phase VI on Monday. With most of the city traffic plying on this stretch of road causing numerous traffic jams throughout the day, Mohali residents are looking forward to soon being able to take a hassle-free ride across the breadth of the city.
GMADA district town planner Gurpreet Singh conducted a survey of the road along with Mohali district planning board chairman Narinder Kumar Sharma late last month.
It was decided at that time that the widening would commence in a phased manner and would cover one sector at a time, starting from Phase VI. Speaking to TOI, Sharma said that due to high congestion on the busy road, it was felt that the widening of the road should be started from Phase VI.
Part of the Dream Weave Walk Network 1998-2010